---
slug: qa-de-feature
title: QA for a feature
summary: How to combine each child's QA with an integration QA issue for the whole feature, created together with the parent and blocked by the children.
locale: en
section: best_practices
applies_to:
  cli: ">=0.28.1"
  skill: ">=1.4.2"
executors: [claude-code, codex, gemini-antigravity]
os: [macos]
audience: [member]
reason_codes: []
intents:
  - how to organize QA
  - QA for the complete feature
  - integration QA task
  - validate the whole feature
reviewed_at: "2026-10-30"
---

# QA for a feature

When a feature is split into several child issues, each child goes through its own validation. That shows the child was built as requested. It doesn't show that the feature works **together**. For that, create an **integration QA** issue.

## The two levels

| Level | Question | Where it happens |
|---|---|---|
| QA for each child | Does the child do what was asked? | In the child's own QA stage |
| Integration QA | Does the feature work end to end, with the parts together? | In its own issue, a child of the parent |

You need both. The first catches errors in a single part. The second catches what only shows up when the parts meet.

## Create the integration QA issue at the start

Create the QA issue **together with the parent and the children**, and leave it **blocked by the children**. That way it isn't forgotten, and it can only start once the parts are ready.

What to write in it:

- **End-to-end flows:** the paths the user takes, from start to finish.
- **Environment and data:** where to test and with what data.
- **Exit criteria:** what must pass for the feature to be considered validated.
- **Out of scope:** what won't be tested here.

## When a failure shows up

Open a child fix issue, linked to the parent, describing what failed and how to reproduce it. Don't quietly reopen a child that is already done: each child's history should keep telling what was delivered.

## Prompt template

```prompt
/malha-os-workflow Propose an integration QA issue for ABC-100, blocked by the children ABC-101 to ABC-105, with the end-to-end flows that must pass. Wait for my OK before creating it.
```

Creating the issue and blocking it with others only works **if your organization's workflow allows it**. See [Organizing work in batches](organizar-em-lotes) for the creation flow.

## Status

- **Available:** the LLM proposing the integration QA issue and the flows to test.
- **Limitation:** creating the issue and linking it to the children depends on your organization's workflow and board.
